Guide
Waste management licence: what it is and how to apply
Updated
A waste management licence is the permission a site needs to store, treat, recycle or dispose of waste. In England and Wales it has been called an environmental permit since 2008, Scotland now issues EASR permits and registrations, and only Northern Ireland still uses the name waste management licence.
If you run a yard, a crusher, a soil recycling site or a transfer station, you need one of these, or a registered exemption for small low-risk work. If you only want to tip a load, you do not need one: you need to take it to a site that has one. Search by postcode on Tip Directory to find licensed waste disposal sites near you.
Tipping on land without a permit is a crime
Depositing, keeping, treating or disposing of waste on land without a permit or registered exemption is a criminal offence in every UK nation. In England and Wales that is section 33 of the Environmental Protection Act 1990. It does not matter whose land it is or whether the landowner agreed: landowners who let waste be tipped can be prosecuted too. “Clean” soil and hardcore are still waste once you are getting rid of them.
What it is called in each nation
| Nation | Regulator | What you apply for |
|---|---|---|
| England | Environment Agency | Environmental permit or registered exemption |
| Wales | Natural Resources Wales | Environmental permit or registered exemption |
| Scotland | SEPA | EASR permit, registration or general binding rule |
| Northern Ireland | NIEA (part of DAERA) | Waste management licence or registered exemption |
England and Wales both work under the Environmental Permitting (England and Wales) Regulations 2016. Scotland moved waste onto the Environmental Authorisations (Scotland) Regulations 2018 (EASR) on 1 November 2025, and old Scottish waste management licences became EASR permits. Northern Ireland licences are issued under the Waste and Contaminated Land (Northern Ireland) Order 1997 and the Waste Management Licensing Regulations (Northern Ireland) 2003.
Permits in England and Wales: standard rules or bespoke
There are two kinds of environmental permit.
- Standard rules permit: a fixed set of rules for a common activity, such as a household, commercial and industrial waste transfer station. It is quicker and cheaper to get, but you cannot change the rules or appeal against them.
- Bespoke permit: written for your site when your operation does not fit a standard rules set. You need a site risk assessment, a written management system and proof of technical competence.
The Environment Agency’s usual decision time is 4 months for a new permit, 3 months to change or cancel one and 2 months to transfer one. Complex applications take longer. You pay an application charge up front and, once granted, a yearly subsistence charge. Charges are in the EA’s charging scheme, so check the current figure there before you budget.
To apply in England, some activities (including waste transfer stations and some storage or treatment) can be done online through GOV.UK’s waste environmental permits page. Others use forms sent to the EA’s Permitting and Support Centre. You can ask the EA for pre-application advice first, which is worth doing for anything bespoke. In Wales you apply to Natural Resources Wales.
Mobile plant, such as a crusher you move from job to job, can have its own mobile plant permit. Each deployment has to be agreed with the regulator before you start. See our mobile plant pages.
Exemptions: narrow, and they must be registered first
Some small, low-risk activities can run under a registered exemption instead of a permit. You must register it before any waste arrives, and it lasts 3 years. The ones groundworkers meet most are:
- U1: using suitable, uncontaminated waste in a construction project, such as a hardstanding or track. It does not allow standalone landscaping, levelling a field or raising land. That needs a permit, and doing it without one is illegal deposit.
- T5: screening and blending waste at the place it is produced or will be used.
- T7: crushing bricks, tiles and concrete where they are produced or used. T7 is registered with the local council, not the EA.
In England exemptions now cost money. As at November 2026 there is a £58.13 registration charge plus a compliance charge per exemption, for example £435.96 for U1 and T5 (band 1). Check the waste exemption charges page for the full list.
New exemption rules for England are proposed to start on 6 January 2027, but they are not law yet: the regulations are still awaiting approval by Parliament. As proposed, they would withdraw some exemptions and tighten others, with a 12 month transition for U1. They would not apply in Wales, Scotland or Northern Ireland. The Welsh Government is also changing exemptions in Wales, and NRW says it will write to holders once the date is confirmed. Until any change is in force, the current rules apply. If you hold an exemption, check with the EA or NRW before relying on it.
Scotland: EASR permits and registrations
In Scotland, waste activities come under EASR. Depending on the risk, an activity is covered by a general binding rule, a registration or a permit from SEPA. Old simple and complex exemptions are being replaced: holders had to apply for an EASR registration or permit by 1 November 2026, or earlier for complex exemptions that expired first. Check with SEPA which level your activity needs.
Northern Ireland: waste management licences
In Northern Ireland all treatment, keeping or disposal of waste must be authorised by NIEA. NIEA asks you to talk to it before you apply. You must already hold planning permission for the site, and the application covers things such as relevant previous convictions, financial provision and technical competence. Applications for new licences, changes, transfers and surrenders go through DAERA’s online service. Some low-risk activities can be registered as exemptions instead: check with NIEA how to register.
Waste carriers are a separate licence
A permit covers a site. Moving waste for a business is covered by waste carrier registration, which people often call a waste carrier licence. See what is a waste carrier licence. In England, carriers, brokers and dealers move into environmental permitting from 22 July 2027 under regulations made in July 2026. Upper tier carriers switch when their current registration is due to expire, and lower tier carriers have 12 months from that date. This change is England only.
How to check a site has a permit
Before you tip, check the site. In England search the Environment Agency’s public register by name or postcode. Wales uses the NRW register, Scotland SEPA’s register and Northern Ireland DAERA’s. Our guide on checking a waste site is licensed shows how. Every site listed on Tip Directory in England comes from the EA permit register, so you can browse waste transfer stations, landfill sites and council tips with that check already done. Whoever takes your load, get a waste transfer note: see your duty of care.
Sources
- Waste: environmental permits, Environment Agency (GOV.UK), checked 19 November 2026
- Apply for a standard rules environmental permit, GOV.UK, checked 19 November 2026
- Environmental Permitting (England and Wales) Regulations 2016, legislation.gov.uk, checked 19 November 2026
- Environmental Protection Act 1990, section 33, legislation.gov.uk, checked 19 November 2026
- Waste exemption charges, Environment Agency (GOV.UK), checked 19 November 2026
- U1 waste exemption: use of waste in construction, GOV.UK, checked 19 November 2026
- Waste exemptions: new rules from January 2027, GOV.UK, checked 19 November 2026
- Check before you register, Natural Resources Wales, checked 19 November 2026
- Moving to the new regulations, SEPA, checked 19 November 2026
- Do you need an EASR waste authorisation?, NetRegs, checked 19 November 2026
- Waste management licence (Northern Ireland), GOV.UK, checked 19 November 2026
- Waste management licensing authorisations, DAERA, checked 19 November 2026
- How do you apply for a waste management licence, NetRegs, checked 19 November 2026
- SI 2026/873 (waste controlling or transporting), legislation.gov.uk, checked 19 November 2026
- Reforming the waste carrier, broker and dealer system, Defra (GOV.UK), checked 19 November 2026
- Public registers online, Environment Agency, checked 19 November 2026