Guide
Phase 1 and phase 2 contaminated land surveys explained
Updated
A phase 1 contaminated land survey is a desk study and site walkover: no digging, just the site’s history, maps, records and a look round. A phase 2 is the intrusive part: trial pits or boreholes, samples sent to a lab, and a risk assessment based on the results.
“Phase 1” and “phase 2” are trade names. The Environment Agency’s guidance, Land contamination risk management (LCRM), uses different words, so it helps to know both. Natural Resources Wales has adopted LCRM too, and the Welsh councils’ developer guide uses the phase names alongside it.
How the phases match the official guidance
LCRM splits the work into three stages: risk assessment, options appraisal, and remediation and verification. The risk assessment stage has three tiers:
- Preliminary risk assessment. This is roughly what consultants call a phase 1. It is always the starting point.
- Generic quantitative risk assessment. Lab results compared against standard screening values.
- Detailed quantitative risk assessment. Site-specific modelling where the generic values are not enough.
The site investigation (the digging and sampling) feeds the two quantitative tiers. That is roughly what gets sold as a phase 2. The work should be done by a competent person: a suitably qualified and experienced consultant.
What a phase 1 desk study covers
The preliminary risk assessment includes a desk study and a site walkover. The desk study looks at the site’s history, the geology and groundwater, and nearby things that could be harmed. The walkover checks the desk study on the ground and looks for visible signs of contamination, access limits and services.
The output is a conceptual site model: a picture, usually a diagram, of what could be wrong. It is built around contaminant linkages: a source, a pathway and a receptor. A source is the contamination. A pathway is how it could reach something. A receptor is what could be harmed: people, groundwater and rivers, wildlife or buildings. No linkage means no risk, even if some contamination is there.
If the phase 1 finds no plausible linkage, and the council is confident in it, the work can stop there. If it finds a possible risk or leaves gaps, you move on to investigation.
What a phase 2 site investigation covers
The investigation is designed around the phase 1 model. It usually means trial pits and soil samples sent to a lab, with ground gas, vapour and groundwater checked where they are a risk. Results are compared with generic assessment criteria, and if those show a possible problem, a detailed site-specific assessment follows.
If the risk is unacceptable, the next LCRM stages are choosing a remediation method and then proving it worked. See what soil remediation is and when it is required and how to get a soil validation report.
When you need one: planning
Most surveys are done because of a planning application. In England, the planning practice guidance says responsibility for a safe development rests with the developer or landowner. Where contamination could be an issue, the applicant should give proportionate site investigation information prepared by a competent person. A desk study and walkover may be enough at first. If they do not show the risk can be dealt with, more investigation is needed before the application is decided.
Councils often grant permission with conditions covering site characterisation, a remediation scheme, carrying it out, and monitoring. The Welsh councils’ guide sets out the same approach in Wales, with a verification report needed once remediation is done. Planning rules differ in Scotland and Northern Ireland: check with the council’s planning or environmental health team.
The separate legal regime: Part 2A
Part 2A of the Environmental Protection Act 1990 is a separate system run by councils for land where significant harm or significant pollution of water is being caused, or there is a significant possibility of it. One version applies in England and Wales, another in Scotland. The planning guidance says that after development, land should not be capable of being treated as contaminated land under Part 2A.
In Northern Ireland, the equivalent regime (Part III of the Waste and Contaminated Land (Northern Ireland) Order 1997) has not been brought into force, according to DAERA. Check with your council and DAERA what is needed for your site.
What the results mean for the soil you dig out
This is where the survey matters to whoever is tipping the load. A phase 2 report gives lab data on the soil, but it is not the same as a waste classification. Soil you dig out and remove is waste, and it still has to be classified under the waste classification guidance (WM3) to decide if it is hazardous (List of Waste code 17 05 03*) or not (17 05 04). Landfill acceptance (WAC) tests decide which landfill can take it; GOV.UK says they must not be used to classify waste.
A clean phase 1 does not make every load inert. Soil and stones from a contaminated site are not on the list of wastes an inert landfill can take without testing. For where to take it, see where to tip contaminated soil, understanding EWC codes and the hazardous waste disposal and landfill sites pages.
Contaminated or untested soil must only go to a site with a permit for it. Depositing waste on land without an environmental permit or registered exemption is a criminal offence in every UK nation, and the landowner who allows it can be liable too. To find a permitted site, search by postcode on Tip Directory.
If you are not sure what applies in your nation, check with the Environment Agency, Natural Resources Wales, SEPA or DAERA.
Sources
- Land contamination risk management (LCRM), Environment Agency (GOV.UK), checked 19 November 2026
- LCRM: Stage 1 risk assessment, Environment Agency (GOV.UK), checked 19 November 2026
- Land affected by contamination, planning practice guidance (GOV.UK), checked 19 November 2026
- Environmental Protection Act 1990, section 78A, legislation.gov.uk, checked 19 November 2026
- Contaminated land, DAERA, checked 19 November 2026
- Development of land affected by contamination: a guide for developers (WLGA and NRW, 2023), checked 19 November 2026
- Waste and Contaminated Land (Amendment) Act (Northern Ireland) 2011, explanatory notes, legislation.gov.uk, checked 19 November 2026
- List of wastes (Commission Decision 2000/532/EC), legislation.gov.uk, checked 19 November 2026
- Landfill waste acceptance criteria (Council Decision 2003/33/EC), legislation.gov.uk, checked 19 November 2026
- Waste classification technical guidance (WM3), GOV.UK, checked 19 November 2026
- How to classify different types of waste: construction and demolition waste, GOV.UK, checked 19 November 2026